Bharti Enviro logo
Bharti EnviroServices Pvt. Ltd.
AMC – PCB Annual Return & Compliance Management — 1
1 / 4
Consultancy Practice

Hand us the compliance calendar — keep your team on production.

Annual maintenance contracts covering all PCB returns, due-date tracking, records, and inspection support.

5

Key capabilities

6

Industries

6

Regulations

Overview

Annual Maintenance Contract (AMC) services for environmental compliance include the preparation, review, and timely submission of all statutory returns, reports, and compliance documents required by the Pollution Control Board (PCB/GPCB). The service also includes continuous regulatory support, compliance monitoring, record maintenance, and liaison with regulatory authorities. The compliance is governed by the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986, the Environment (Protection) Rules, 1986, the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, and other applicable environmental regulations.

Key Capabilities

  • Comprehensive environmental compliance support through preparation and submission of statutory returns and reports to Pollution Control Board (PCB/GPCB).
  • Preparation and online filing of Annual Returns, Form-3, Form-4, Form-V, Monthly Patrak, DPR, and other regulatory submissions.
  • Review and verification of environmental data related to emissions, effluent discharge, hazardous waste, water consumption, and resource utilization.
  • Continuous monitoring of consent conditions, environmental authorizations, and regulatory compliance requirements.
  • Assistance in maintaining compliance records and providing regulatory support during inspections and audits.

Applicable Regulatory Framework

  • Environment (Protection) Act, 1986
  • Water (Prevention and Control of Pollution) Act, 1974
  • Air (Prevention and Control of Pollution) Act, 1981
  • Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016
  • Environment (Protection) Rules, 1986
  • Applicable PCB/GPCB reporting requirements

Industries Served

PharmaceuticalsChemicalsTextilesEngineeringIndustrial estatesHealthcare

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.