Bharti Enviro logo
Bharti EnviroServices Pvt. Ltd.
Sewage Treatment Plant (STP) — view 1
Sewage Treatment Plant (STP) — view 2
Sewage Treatment Plant (STP) — view 3
Sewage Treatment Plant (STP) — view 4
Wastewater Treatment Plant

Sewage Treatment Plant (STP)

Conventional and advanced STPs delivering treated effluent fit for safe discharge or reuse.

5 KLD – 100 MLD

Capacity range

≥ 95% (outlet < 20 mg/L CPCB class A)

BOD removal

≥ 90%

COD removal

< 30 mg/L (< 10 mg/L MBR)

TSS outlet

Overview

What is a Sewage Treatment Plant (STP)?

Bharti Enviro engineers sewage treatment plants across the capacity spectrum — from compact package units for housing societies to large-scale municipal schemes — using proven activated-sludge, MBBR, SBR, or MBR technologies. All designs target CPCB/SPCB discharge standards or tertiary reuse quality for irrigation and toilet flushing under municipal STP guidelines.

Key Features

  • Technology selection (AS/MBBR/SBR/MBR) optimised for site footprint and reuse goals
  • BOD outlet < 10 mg/L and TSS < 10 mg/L achievable with MBR configuration
  • Sludge dewatering by screw press or belt press to ≥ 20% DS cake
  • SCADA with remote monitoring via CPCB-standard online effluent monitoring (OEM) nodes

Technical Specifications

Engineering Parameters

Capacity range
5 KLD – 100 MLD
BOD removal
≥ 95% (outlet < 20 mg/L CPCB class A)
COD removal
≥ 90%
TSS outlet
< 30 mg/L (< 10 mg/L MBR)
Sludge cake DS
≥ 20% (screw press dewatering)
Design standard
CPHEEO Manual; CPCB STP Guidelines 2017

Specifications are indicative. Final parameters confirmed during engineering review.

Gallery

Installation Gallery

Auto-rotating — hover to pause, click thumbnails to jump, expand for full view.

Sewage Treatment Plant (STP) — view 1
Sewage Treatment Plant (STP) — view 2
Sewage Treatment Plant (STP) — view 3
Sewage Treatment Plant (STP) — view 4
1 / 4

Applications

Industries Served

Our Sewage Treatment Plant (STP) is deployed across a wide range of industrial and municipal applications.

Residential townships and housing societiesMunicipal sewage schemesHotels, resorts, and hospitalityHospitals and healthcare campusesCommercial complexes and IT parksEducational institutions

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.