Wastewater Treatment Plant

STP — SBR Base Plant

Sequencing batch reactor STPs offering flexible nutrient removal in a single-tank process.

50 KLD – 50 MLD

Capacity range

< 10 mg/L

BOD outlet

< 10 mg/L

TN outlet

< 1 mg/L

TP outlet

Overview

What is a STP — SBR Base Plant?

The SBR process condenses fill, react, settle, and decant phases into a single basin, providing flexible biological nutrient removal (BNR) without separate clarifiers or recycle streams. Bharti Enviro's SBR STPs use programmable phase-timing with dissolved-oxygen and ORP feedback to achieve simultaneous nitrification-denitrification and biological phosphorus removal in one compact structure.

Key Features

  • Single-basin BNR: simultaneous BOD, nitrogen, and phosphorus removal
  • Programmable phase control adapts to diurnal and seasonal flow variations
  • No secondary clarifier or recirculation pumps — lower civil cost
  • Outlet meets stringent Class-A CPCB norms for reuse-quality discharge

Technical Specifications

Engineering Parameters

Capacity range
50 KLD – 50 MLD
BOD outlet
< 10 mg/L
TN outlet
< 10 mg/L
TP outlet
< 1 mg/L
Cycle time
4–8 hours (2–3 cycles/day)
MLSS
3,000–5,000 mg/L

Specifications are indicative. Final parameters confirmed during engineering review.

Gallery

Installation Gallery

Auto-rotating — hover to pause, click thumbnails to jump, expand for full view.

STP — SBR Base Plant — view 1
STP — SBR Base Plant — view 2
STP — SBR Base Plant — view 3
STP — SBR Base Plant — view 4
1 / 4

Applications

Industries Served

Our STP — SBR Base Plant is deployed across a wide range of industrial and municipal applications.

Municipal sewage systemsLarge residential townshipsIndustrial wastewater with nutrient-removal requirementUpgrade of overloaded lagoon systemsSensitive environmental discharge zonesNutrient-sensitive water-body outfalls

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.