Bharti Enviro logo
Bharti EnviroServices Pvt. Ltd.
Grey Water Treatment Plant — view 1
Grey Water Treatment Plant — view 2
Grey Water Treatment Plant — view 3
Grey Water Treatment Plant — view 4
Wastewater Treatment Plant

Grey Water Treatment Plant

Compact grey-water recycling units for buildings to achieve 30–40% water savings.

500 L/day – 500 KLD

Capacity range

150–250 mg/L (grey water typical)

BOD inlet

< 10 mg/L

BOD outlet

< 5 NTU

Turbidity outlet

Overview

What is a Grey Water Treatment Plant?

Bharti Enviro's grey-water treatment systems recover and recycle bathroom, laundry, and kitchen sink wastewater through screening, bio-contact filtration, and UV disinfection, producing non-potable reuse water for toilet flushing, irrigation, and HVAC tower make-up. Green building rating (LEED, IGBC, GRIHA) compliance is a standard design output for all new construction projects.

Key Features

  • Treats bathroom + laundry grey water to CGWB non-potable reuse standards
  • Bio-contact filter eliminates odour without chemical aeration or dosing
  • UV (254 nm) + activated carbon polishing for E. coli-free reuse water
  • Supports LEED / IGBC water credit — typically 30–40% potable-water savings

Technical Specifications

Engineering Parameters

Capacity range
500 L/day – 500 KLD
BOD inlet
150–250 mg/L (grey water typical)
BOD outlet
< 10 mg/L
Turbidity outlet
< 5 NTU
E. coli outlet
< 10 CFU/100 mL
Water saving
30–40% potable water reduction

Specifications are indicative. Final parameters confirmed during engineering review.

Gallery

Installation Gallery

Auto-rotating — hover to pause, click thumbnails to jump, expand for full view.

Grey Water Treatment Plant — view 1
Grey Water Treatment Plant — view 2
Grey Water Treatment Plant — view 3
Grey Water Treatment Plant — view 4
1 / 4

Applications

Industries Served

Our Grey Water Treatment Plant is deployed across a wide range of industrial and municipal applications.

Residential apartments and villasHotels and resortsCommercial office buildingsAirports and transport hubsEducational campusesHealthcare facilities

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.